Chandler Council hashes out several code amendments
Independent Newsmedia file/Jason W. Brooks
Contractors work on repaving a Chandler residential street in mid-2026. City staff recently ran several new code amendments past the Chandler City Council in a work session.
In 2024, the Chandler City Council approved what some staff called a “cornucopia” of development code amendments.
“We promised, at that meeting, that we planned to review code and bring back a few more code cleanups every year,” acting planning manager Lauren Schumann told Council during a recent work session. “But two straight years of big changes from the state legislature, which we focused on getting into code right away, took us away from that. So now we want some Council feedback on language cleanup and direction in order to get these into code by the end of the year.”
Schumann said the Planning Department messaged all city departments to see which areas managers and directors wanted to bring up for cleanup or major changes.
There turned out to be 15 areas of concern, though 10 are “cleanup or clarification” language changes, while five are directional decisions in which “we want to have a broader conversation.”
One concern had to do with citation delivery. Erica Barba, the city’s Neighborhood Preservation senior manager, said regarding citations for property code violations, staff want to give inspectors the opportunity to post a copy of the citation in a conspicuous place in or about the structure affected at the time of notification, if no one is available and/or doesn’t answer a knock on the door.
Barba said mailing a copy of the citation by certified or registered mail, return receipt requested, to the defendant’s last known address will still take place. The change would be to no longer wait for the certified mail to either be signed as received or returned as undeliverable before posting it to the structure.
“This year, amid our 4,300 inspections so far, only about 1% result in citations,” Barba said.
Councilmember O.D. Harris clarified that the only people cited are those the city has tried to contact repeatedly about a violation with no resolution.
“How many points of contact have we had with the resident, by the time a citation is issued?” Harris asked.
“We’ve gone through an initial notification, plus 30-, 60-, 90-day notices and six months,” Barba clarified.
The other four planned material changes to code are:
-In new commercial, office and industrial developments, electric-vehicle charging spaces may be counted toward a maximum of 10% percent of the required parking. In multifamily residential developments, such spaces may be counted toward parking requirements only when the charging spaces are marked as reserved for residents.
-Ramadas must have a minimum 1-foot separation from other structures.
-Add two-unit multifamily housing as permitted to what’s permitted under a multifamily housing permit, rather than only one- or three-unit dwellings.
-Replace a 1992 city code limiting the height of Chandler Municipal Airport buildings within 100 feet of the airport boundary to 35 feet in height with building setback requirements, eliminating the 100-foot zone.
Jason W. Brooks News Editor | Chandler Independent
Jason W. Brooks joined Independent Newsmedia, Inc., USA, in July 2021 as an associate editor. After a year covering Buckeye, he has covered Chandler since the fall of 2022, in addition to assisting the Daily Independent throughout his time at INI.
Education: University of New Mexico, bachelor of arts in journalism and mass communication, print emphasis, English minor.
Random Fact: He and his siblings witnessed a Space Shuttle launch and landing in the same year in person, on opposite coasts.
Hobbies: Karaoke, bicycling and American Sign Language.
Comments
No comments on this item Please log in to comment by clicking here