Axle on Demand signs pre-lease in industrial 303 Corridor
Special to Independent Newsmedia
Posted 6/6/23
Echo Park 303, a two-building, modern industrial facility in Glendale near the intersection of Northern Parkway and Reems Road, has added a new tenant.
You must be a member to read this story.
Join our family of readers for as little as $5 per month and support local, unbiased journalism.
Current print subscribers can create a free account by clicking here
Otherwise, follow the link below to join.
To Our Valued Readers –
Visitors to our website will be limited to five stories per month unless they opt to subscribe. The five stories do not include our exclusive content written by our journalists.
For $6.99, less than 20 cents a day, digital subscribers will receive unlimited access to YourValley.net, including exclusive content from our newsroom and access to our Daily Independent e-edition.
Our commitment to balanced, fair reporting and local coverage provides insight and perspective not found anywhere else.
Your financial commitment will help to preserve the kind of honest journalism produced by our reporters and editors. We trust you agree that independent journalism is an essential component of our democracy. Please click here to subscribe.
Echo Park 303, a two-building, modern industrial facility in Glendale near the intersection of Northern Parkway and Reems Road, has added a new tenant.
Logistics specialist Axle on Demand signed a 126,075-square-foot pre-lease with the Phoenix Office of JLL.
The transaction represents Axle on Demand’s sixth metro Phoenix location and fills more than half of Echo Park 303’s Building A almost four months before the anticipated completion of the Class A industrial project.
Echo Park 303 is developer Echo Real Estate Capital’s first metro Phoenix industrial development. The 676,336-square-foot project totals two buildings on approximately 40 acres at 9501 and 9701 N. 151st Ave.
It is located within Woolf Logistics Center, minutes from the Loop 303 and Northern Parkway.
“We are huge proponents of the Phoenix market and excited to be nearing completion on our first industrial development here,” Echo Real Estate Capital Principal Jon Boyajian shared in a statement. “We are equally pleased to welcome Axle on Demand, who like us is looking to grow in this strategic industrial hub. Signing this pre-lease months before project completion has us optimistic for the future of Echo Park 303 and the tenant synergy we will create here.”
With its new lease, Axle on Demand will occupy approximately 55% of Echo Park 303’s Building A, which it will use for third party logistics services spanning warehousing, fulfilment and IT operations. Building A totals 220,240 square feet with a rear-load configuration. It features 32’ clear height, 135’ secured concrete truck court, 3,000 amps of power and 3,100-square-foot spec office suite.
Also under construction is Echo Park 303 Building B, a 455,936-square-foot, Class A cross-dock warehouse featuring 40’ clear height, 185’ secured concrete truck court, 6,000 amps of power and 3,850-square-foot spec office suite. Building B is available for a single tenant or divisible to 225,000 square feet for multi-tenant use. Both buildings are slated for completion in September.
Additional features at Echo Park 303 include 163 dock-high and six grade-level doors, 743 parking spaces and 120 trailer spaces in gated yards, electric vehicle charging stations, two-story storefront windows, 60’ speed bays, 7” reinforced slab, ESFR fire sprinklers and PAD zoning.