Log in

Development

Home addition may encroach in setback area, Mesa board says

Posted

A new building addition at a Mesa home may encroach into the required rear setback, the city’s Board of Adjustment decided recently.

The board on March 1 voted unanimously in a consent agenda with other items to approve a variance to allow the change at property south of East McKellips Road and west of North Greenfield Road. It is within the single residence 35 zoning district with a planned area development overlay. Board members Adam Gunderson and Heath Reed were absent.

The variance will allow construction of a proposed 2,211-square-foot home addition that will encroach approximately 15 feet 6 inches into the required 30-foot rear setback, according to a written staff report.

“You can see it kind of has a triangular kind of shape here with an acute angle where the rear property line and the side property line meet, which kind of reduces the buildable area,” Staff Planner Emily Johnson said at a study session prior to the meeting. “The south property line is considered the rear of the property because it is a corner lot.”

Tim Boyle is the applicant. Kristen Ketterson is the owner.

The lot has two street-facing sides — a very thin side and a long side — and the house was built with the primary facade facing the long side on the east, according to a written project narrative from Atmosphere Architects.

“Because this irregularly shaped lot is so narrow in the front, creating an addition that is one-half the width of the building is challenging. If this were a standard square lot a similar encroachment would be allowed by code,” it states. “We request a variance to allow this addition to encroach into the rear yard 15 feet 6 inches. It is still 14 feet 7 inches from the rear fence.”

The seven-member Mesa Board of Adjustment conducts public meetings to hear and decide requests for variances, special-use permits and interpretations of the city of Mesa zoning ordinance and sign code. Members are appointed for staggered terms of three years, according to the city’s website.

Richard H. Dyer can be reached at rdyer@iniusa.org, or on Twitter @rhdyer. To voice your opinion on this story, connect with us at AzOpinions@iniusa.org.

Mesa Board of Adjustment

Share with others


Have an opinion on this story? Click here to send a letter to our editors.

Comments

No comments on this item Please log in to comment by clicking here