Log in

COMMUNITY NEWS

Roosevelt Street storm drain work begins soon in Scottsdale/Tempe

Construction of a new storm drain that will improve stormwater collection and prevent flooding near the Scottsdale-Tempe border is set to begin Nov. 3.

Construction will take place along Roosevelt Street/Continental Drive beginning at Miller Road and work west to 68th Street/College Avenue. This is a joint project by Scottsdale, Tempe and the Flood Control District of Maricopa County.

The new Roosevelt Street storm drain will extend an existing 78-inch drain that channels water to the Indian Bend Wash. Stormwater will be captured in the streets north of Roosevelt Street/Continental Drive, improving drainage conditions in areas to the south.

You must be a member to read this story.

Join our family of readers starting at $5 for your first month and support local, unbiased journalism.


Already have an account? Log in to continue.

Otherwise, follow the link below to join.

Please log in to continue

Log in
I am anchor
COMMUNITY NEWS

Roosevelt Street storm drain work begins soon in Scottsdale/Tempe

Posted

Construction of a new storm drain that will improve stormwater collection and prevent flooding near the Scottsdale-Tempe border is set to begin Nov. 3.

Construction will take place along Roosevelt Street/Continental Drive beginning at Miller Road and work west to 68th Street/College Avenue. This is a joint project by Scottsdale, Tempe and the Flood Control District of Maricopa County.

The new Roosevelt Street storm drain will extend an existing 78-inch drain that channels water to the Indian Bend Wash. Stormwater will be captured in the streets north of Roosevelt Street/Continental Drive, improving drainage conditions in areas to the south.

The project includes the trenching and installation of:

• 7,500 linear feet of storm drain.
• 1,200 linear feet of lateral connection pipes.

• Lateral drains along 74th Street, 70th Street and 68th Street.
• Curb inlet catch basins.
• Manholes.

The total project cost is about $13 million. Through an intergovernmental agreement, the Flood Control District of Maricopa County will contribute $8.45 million and the cities of Scottsdale and Tempe will each contribute $2.275 million.

The project is expected to be completed in December 2026.

Information can be found on Tempe’s Water Project Updates website.

Scottsdale, Tempe, Storm Drain

Share with others


Have an opinion on this story? Click here to send a letter to our editors.

Comments

No comments on this item Please log in to comment by clicking here