Log in

Development

Gravity Energy Drinks planned at Power, Baseline in Mesa

Allowing deviations from certain development standards at a planned Gravity Energy Drinks restaurant east of Power Road and south of Baseline Road will be considered in August by the Mesa Board of Adjustment.

The item was to be discussed and voted on at the board’s July 5 meeting. Due to technical difficulties, the meeting was not called to order and all items were continued to the Aug. 2 meeting that begins at 5 p.m. for a study session and 5:30 p.m. for a meeting in the lower council chambers, 57 E. First St.

The case is a request for a substantial conformance improvement permit to allow for deviations from certain development standards to allow for the development in a limited-commercial zone with a planned area development overlay district.

You must be a member to read this story.

Join our family of readers starting at $5 for your first month and support local, unbiased journalism.


Already have an account? Log in to continue.

Otherwise, follow the link below to join.

Please log in to continue

Log in