Log in
development

$3.5M construction project approved by Apache Junction sewer district board

A $3.5 million sewer district operations and maintenance building is to be constructed in Apache Junction.

The Apache Junction Sewer District Board voted unanimously Aug. 26 to approve the construction bid from BFL Construction Co. Inc. at a cost not to exceed $3.5 million to be paid from the capital and replacement fund.

It is to be constructed by October 2026 on sewer district property at 5661 S. Ironwood Drive and is to include a two-story pre-engineered metal maintenance building with office, control room, storage and maintenance bays. The building is also to have a flexible storage area and vehicle lift to the second story, according to a notice and call for bids.

You must be a member to read this story.

Join our family of readers starting at $5 for your first month and support local, unbiased journalism.


Already have an account? Log in to continue.

Otherwise, follow the link below to join.

Please log in to continue

Log in