ADOT seeks public input on North-South Corridor in Pinal County
Posted 4/26/25
The Arizona Department of Transportation is seeking public input as it begins an engineering and environmental study for the North-South Corridor’s proposed northern segment spanning 20 miles …
You must be a member to read this story.
Join our family of readers for as little as $5 per month and support local, unbiased journalism.
Current print subscribers can create a free account by clicking here
Otherwise, follow the link below to join.
To Our Valued Readers –
Visitors to our website will be limited to five stories per month unless they opt to subscribe. The five stories do not include our exclusive content written by our journalists.
For $6.99, less than 20 cents a day, digital subscribers will receive unlimited access to YourValley.net, including exclusive content from our newsroom and access to our Daily Independent e-edition.
Our commitment to balanced, fair reporting and local coverage provides insight and perspective not found anywhere else.
Your financial commitment will help to preserve the kind of honest journalism produced by our reporters and editors. We trust you agree that independent journalism is an essential component of our democracy. Please click here to subscribe.
Need to set up your free e-Newspaper all-access account? click here.
Non-subscribers
Click here to see your options for becoming a subscriber.
Register to comment
Click here create a free account for posting comments.
Note that free accounts do not include access to premium content on this site.
I am anchor
State Route 505
ADOT seeks public input on North-South Corridor in Pinal County
ADOT
This phase will develop the purpose of and need for the proposed project, and develop a preliminary range of alternatives for 400-foot-wide freeway alignments within the 1,500-foot corridor.
Posted
The Arizona Department of Transportation is seeking public input as it begins an engineering and environmental study for the North-South Corridor’s proposed northern segment spanning 20 miles between Apache Junction and Florence.
ADOT is initiating a Tier 2 Environmental Impact Statement for Segment 1 of the North-South Corridor from US60 to Arizona Farms Road. This phase will develop the purpose of and need for the proposed project, develop a preliminary range of alternatives for 400-foot-wide freeway alignments within the 1,500-foot corridor established in the Tier 1 Environmental Impact Statement, and review potential interchanges, according to a release.
ADOT’s outreach for this study includes public meetings in May that will provide an overview of the study and seek input on a preliminary range of alternatives for the highway alignment and the project’s purpose and need. The public comment period lasts through June 10.
The corridor, also known as State Route 505, is under study to: enhance the area’s transportation network to accommodate the current and future population and employment growth; improve access to future development and other centers of activity; improve regional mobility; provide an alternative to and reduce congestion on Interstate 10; improve north-to-south connectivity; and integrate with the region’s transportation network.
The following public meetings are scheduled:
5:30-7:30 p.m., Thursday, May 15, Apache Junction Multi-Generational Center, 1035 N. Idaho Road, Apache Junction
5:30-7:30 p.m., Tuesday, May 20, Poston Butte High School, 32375 N. Gantzel Road, San Tan Valley
A virtual public meeting is scheduled for 6 to 7 p.m. Thursday, May 22. To participate:
Online: https://bit.ly/NSSegment1
Phone: 408.638.0968
Meeting number: 971 5032 1962
Webinar password: ADOTNSS1
Call-in password: 14405974
Spanish audio channel:
Phone: 669.444.9171
Meeting number: 970 2160 6058
Call-in password: 66865130
The same information will be presented at each meeting. Meeting presentations and materials will be posted to the study website at northsouth-segment1.com for those unable to attend.
A separate study will be conducted for Segment 2 of the North-South Corridor between Florence and I-10 in Eloy.
Ultimately this study between Apache Junction and Florence will:
Recommend a preferred alternative for the project alignment, interchange locations and other features based on engineering and environmental considerations as well as agency and public input
Develop and circulate for public review and comment a draft Tier 2 Environmental Impact Statement and Design Concept Report that identifies the Recommended Build Alternative, which will be compared against the No Build, or do nothing, alternative
Prepare a final Environmental Impact Statement and Design Concept Report document identifying the Selected Alternative
Comments may be submitted in any of the following ways through June 10: